top of page

Eastern State Hospital

  • Writer: Corey Mullikin
    Corey Mullikin
  • Aug 19, 2025
  • 1 min read

Canariis Corporation recently built a variable speed triplex Primary Chilled Water HVAC Package and a variable speed triplex Primary Heating Water HVAC Package for Eastern State Hospital. This project was completed in 2013 and located at University of Kentucky’s Coldstream Research Campus. The $129 million facility replaces the 185 year old hospital and approximately 300,000 sq ft. Each unit includes spring isolation, aluminum tread plate base and monodirectional hoist and trolley systems. Both units feature Johnson Controls. The entire hydronic system was completely hydro-static, performance, electrical, efficiency and control tested before leaving the factory. Most importantly, it meets the highest green building and performance measures-LEED Certified.


Architect: Arrasmith Judd Rapp Chovan

Engineer: Staggs and Fisher

Contractor: TJ Dyer / Rossen / Eliteair

GC / CM: D.W. Wilburn

Equipment:

Ventrol (6) Custom Air Handling Units

Canariis (1) Chilled Water Pump Pkg

Aaon (4) Split MUA w/ Energy Recovery

Canariis (1) Heating Pump Pkg

Daikin (8) VRV Heat Recovery Systems

Daikin (13) Ductless Mini-Splits

McQuay (3) Energy Recovery

McQuay (2) Modular AHU’s

McQuay (783) Hot Water Coils

McQuay (32) Unit Heaters


Get in Touch

Lexington Office

680 Bizzell Dr. 

Lexington, KY 40510

859.255.9665

​

Louisville Office

13151 Middletown Industrial Blvd

Louisville, KY 40223

502.473.0829

​

Paducah Office

115 Eaglet Cove

Paducah, KY 42003

​270.898.6976

  • Facebook
  • LinkedIn
  • Instagram

Thanks for submitting!

bottom of page