Eastern State Hospital
- Corey Mullikin
- Aug 19, 2025
- 1 min read
Canariis Corporation recently built a variable speed triplex Primary Chilled Water HVAC Package and a variable speed triplex Primary Heating Water HVAC Package for Eastern State Hospital. This project was completed in 2013 and located at University of Kentucky’s Coldstream Research Campus. The $129 million facility replaces the 185 year old hospital and approximately 300,000 sq ft. Each unit includes spring isolation, aluminum tread plate base and monodirectional hoist and trolley systems. Both units feature Johnson Controls. The entire hydronic system was completely hydro-static, performance, electrical, efficiency and control tested before leaving the factory. Most importantly, it meets the highest green building and performance measures-LEED Certified.
Architect: Arrasmith Judd Rapp Chovan
Engineer: Staggs and Fisher
Contractor: TJ Dyer / Rossen / Eliteair
GC / CM: D.W. Wilburn
Equipment:
Ventrol (6) Custom Air Handling Units
Canariis (1) Chilled Water Pump Pkg
Aaon (4) Split MUA w/ Energy Recovery
Canariis (1) Heating Pump Pkg
Daikin (8) VRV Heat Recovery Systems
Daikin (13) Ductless Mini-Splits
McQuay (3) Energy Recovery
McQuay (2) Modular AHU’s
McQuay (783) Hot Water Coils
McQuay (32) Unit Heaters
